Project title: Isolated photovoltaic system for a pig fattening farm in “El Marcial” in Lécera, Zaragoza.

Location: Lécera, Zaragoza

Date of realisation: March 2023

Technical details: Installation of a 16.35 kWp photovoltaic system for isolated self-consumption with energy storage in batteries. The modules are installed on a coplanar structure on the roof of the pig farm building and the equipment is located inside one of the farm’s rooms.

The battery system consists of two battery packs, each with a capacity of 15.36 kWh, giving a total capacity of 30.72 kWh.