Project title: Grid-connected photovoltaic system for self-consumption without storage on a poultry farm in Cetina (Zaragoza)

Location: Cetina, Zaragoza

Date of realisation: 1st phase in April 2021, 2nd phase in May 2022

Technical details: Installation of a photovoltaic system with a total of 113.4 kWp on the roof of the farm building, for self-consumption with surpluses. The installation was carried out in two phases.

This system avoids the emission of 95 tonnes of CO2eq per year.