Project title: Grid-connected photovoltaic system for self-consumption without storage on a breeding and fattening pig farm in Belchite (Zaragoza)

Location: Belchite, Zaragoza

Date of realisation: July 2021

Technical details:

1st phase: installation of 50 kW photovoltaic system for grid-connected self-consumption without storage, June 2019

2nd phase: extension of the photovoltaic system to 122.8 kWp, with 100 kW inverter, July 2021