Project title: Grid-connected photovoltaic system for self-consumption in La Sarretilla industrial estate in Belchite (Zaragoza)
Location: La Sarretilla Industrial Estate, Belchite, Zaragoza
Date of realisation: October 2022
Technical details: Installation of a 68.67 kWp photovoltaic system for self-consumption without accumulation, connected to the grid with compensated surpluses. The modules are placed with a coplanar structure on the roof of the central building, and the equipment is located inside the building.
The system will use renewable energy to cover the energy consumption of the building of an agricultural machinery manufacturer.