Project title: Photovoltaic self-consumption connected to the grid without storage at the Marqués de Lazán Hotel in Letux
Location: Marqués de Lazán Hotel, Cam. Belchite, 2, Letux, Zaragoza
Date of realisation: October 2019
Technical details: 9.86 kWp photovoltaic system for self-consumption with surplus on the roof of the hotel.